We like to keep on the go at Talltrees!

As you may or may not be aware, Talltrees has all it's proceeds put back into the fishery.

We currently have a few projects on the go and in the pipeline, all listed below.....

AUTUMN PROGRAMME 2008

Details to follow

 

AMENITIES BLOCK

A project currently under way is the new Amenities block. Comprising of a toilet, shower Kitchin & communal area.

PHASE 1 INSTALL SEPTIC TANK, SET OUT BASE

PHASE 1 COMPLETED

PHASE 2 BUILD BLOCK CONSTUCTION, TIMBER & LINE ROOF

PHASE 3 INSTALL TOILET, SHOWER & KITCHIN

 

CAR PARK

A project currently under way is the the re surfacing of the car park. The edges are to be built up with railway sleepers, and the whole of the surface covered in tarmac plannings. The driveway/entrance is now complete.

 

PEG REBUILDING

We are about to improve some of the pegs, giving a more level base with new sleeper edging. Swims that will be improved are as follows:

BACK 1, BACK 2, SUMMER SWIM

 

TREE FELLING

Sometime during the summer, the big Bat Willow in the top far left corner will have to be felled. During the winter this year it has been noticed that it has leaned over to the lake by a worrying amount! The idea of felling is to get it now, before it has to be removed from the lake!

 

FISHING LODGE

DETAILS TO FOLLOW

 

DE-SILTING

The siltex has been waiting a while! The de-silting will coincide with the peg refurbishment, as we will be using a mini digger to remove silt from the car park end corners and big cat corner.